Folien zu Vorträgen   Daten   Publikationen   Links

Über mich

About me
Medienspiegel/In the Media

Heiteres & Streitbares

Startseite Gregor Czisch

Supergrid for Renewables

Click for printable version
back to overview

previous slide

next slide


Click on the slide to get it in print quality within a new screen.
 
On this map cost calculations for offshore wind parks of 150 MW rated power with wind turbines each 1.5 MW are displayed. At the best sites where the wind conditions are good, the seafloor is not too deep and also other conditions are advantageous, the costs of electricity are estimated to be within the range of 3 to 4 €c/kWh.

Impressum
Verantwortlich: G. Czisch; Gestaltung: C. Budig, G. Czisch, W. Flemming